EDF, the concessionaire for the Brassac hydroelectric development, has planned works to repair the exterior coating of the forced conduit (CF), as well as civil engineering maintenance on the support structures. These interventions are scheduled between January 15 and July 15, 2027.
An execution file has been submitted by the concessionaire and is currently under review by the DREAL. Following this review, a prefectural order will be signed to regulate these works.
The file is open for public participation from October 13 to November 6, 2026, inclusive. The opinions expressed will be examined during the drafting of the prefectural order authorizing the works.




