These operations constitute a key stage in the regulatory authorisation process for this flood protection structure. They aim to improve knowledge of the embankment system and to obtain the data necessary to assess its safety level.
The investigations, carried out by the company Ginger CEBTP, included core drilling within the embankment, permeability tests and various tests to characterise the materials making up the structure. In addition, Akila Ingénierie carried out camera inspections of the crossing structures to assess their condition and operation.
These crossing structures are potential weak points in the embankment system, as they can cause leakage or internal erosion phenomena. Their regular monitoring helps to ensure the safety of the structure. The results of these investigations will enrich the ongoing Hazard Study and contribute to defining the measures necessary to ensure the longevity and safety of the embankment system.